🏗️ Part of: Building & Developer Costs →
Faheema Sheikh · SA Property & Investment Analyst · 15 Years Experience
🕐 Last Updated: September 2026  ·  SANS 10109-2 Mix Ratios & SA Screed Pricing

Quick answer: Standard sand:cement floor screed uses roughly 11kg cement and 28 litres of sand per m² at 25mm thickness (Concrete Institute SA, SANS 10109-2), plus 10% wastage. Self-levelling compound coverage depends on the product, thin levelling compounds and structural self-levelling screeds have different maximum thicknesses per pour. Installed screed costs approximately R180–R500/m² in 2026 depending on type and finish.

🧱Screed Calculator: Enter Details
Total area to be screeded
Suggested for bonded screed: 25–50mm
🧱 Materials Needed
Sand Needed
Est. Cost (Materials / Installed)
Thickness Used

⚠️ For planning purposes only. Confirm exact mix ratios and pricing with your supplier before ordering.

How to Use This Calculator

Select traditional sand:cement screed for a hand-floated floor, or self-levelling compound if you're using a bagged, pre-mixed pouring product.

Enter the area in square metres and your intended screed thickness in millimetres. For self-levelling compound, also choose thin levelling compound or structural self-levelling screed, since coverage and maximum thickness per pour differ between the two.

Screed vs concrete vs plaster: what's actually different

Screed is a thin, aggregate-free sand:cement layer laid over a structural concrete slab to create a smooth, level surface ready for tiling, flooring or carpet. It's easy to confuse with two other materials on this site. Concrete is the structural slab itself, poured thick with coarse aggregate to carry load, screed sits on top of that slab and does no structural work at all. Plaster uses a similar sand:cement family of mixes but is applied to walls and ceilings, not floors. If you're pricing a full build, you likely need all three calculators for different parts of the job, not one for all of them.

Sand:cement screed mix ratio and coverage

The Concrete Institute's own SANS 10109-2 reference gives a floor screed mix of 3.5 parts sand to 1 part cement by mass. On site, that translates to roughly 130 litres of moist, loose sand per 50kg bag of cement. This ratio holds regardless of whether the screed is bonded, monolithic or unbonded, only the thickness changes by type (see the table below). At 25mm thickness, that mix works out to approximately 11kg of cement and 28 litres of sand per square metre, before adding the recommended 10% wastage allowance. A single 50kg bag of cement covers roughly 4.5m² at 25mm before wastage.

Worth flagging honestly: not every source agrees on the sand quantity. AfriSam's own online calculator implies a noticeably leaner cement content relative to sand than the Concrete Institute figure used here. Treat the cement quantity above as reliable and the sand quantity as a reasonable estimate, your exact supplier's mix may vary, so confirm before a large order.

Screed thickness by application

ApplicationThicknessNotes
Monolithic15–40mmLaid while the base slab is still wet
Bonded25–50mmOnto a hardened concrete slab, most common residential case
Unbonded, on DPM50mm+Over a damp-proof membrane
Unbonded, over insulation70mm+Underfloor heating or other compressible layer

Self-levelling compound: a different product, different maths

Self-levelling compound is a pre-mixed bagged product you pour and it settles flat under its own weight, rather than being hand-floated like traditional screed. Coverage depends heavily on the specific product. A thin levelling compound (used to smooth minor imperfections before flooring goes down) typically covers around 4m² per 20kg bag at 2.5mm, and shouldn't exceed 3 to 4mm per application. A thicker structural self-levelling screed covers a broadly similar rate per millimetre but can be poured up to 10mm in a single application. These are not interchangeable products, always check your specific brand's datasheet before ordering in bulk.

Screed cost per m² in South Africa (2026)

Screed pricing varies by region, screed type and whether you're pricing materials only or a full installed job. DIY materials-only sand:cement screed runs roughly R80–R120/m². A professionally installed standard residential screed typically costs R180–R250/m², while self-levelling or commercial-grade screed installed by a contractor can run R350–R500/m² or more. These are market rates from SA trade sources, not a fixed price list, always get a local quote to confirm before budgeting.

A worked example: 45m² bonded screed at 30mm

Take a 45m² room needing a bonded screed at 30mm thickness. At 0.44kg cement and 1.12 litres of sand per m² per mm, the base quantities are 45 × 30 × 0.44 = 594kg cement and 45 × 30 × 1.12 = 1,512 litres of sand. Adding the 10% wastage allowance brings that to roughly 654kg cement, which means 14 bags of 50kg cement (13.08 rounds up, since a supplier only sells whole bags), and 1,664 litres (1.66m³) of sand. At R180–R250/m² installed, budget roughly R8,100–R11,250 to have this room professionally screeded, or R3,600–R5,400 materials-only if doing it yourself.

⚠️ Disclaimer: This calculator provides indicative material quantities and cost estimates for planning purposes only. It does not constitute structural, engineering or professional construction advice. Mix ratios, coverage rates and pricing vary by supplier, product and region, always confirm with your supplier before ordering. SA Property Tools accepts no liability for decisions made based on this information.

Frequently Asked Questions

The Concrete Institute's own SANS 10109-2 reference gives 3.5 parts sand to 1 part cement by mass, or in practical site batching, 130 litres of moist sand per 50kg bag of cement. This ratio doesn't change between bonded, unbonded or monolithic screed, only the thickness does. Cement should comply with SANS 50197-1 CEM I or CEM II A.
At 25mm thickness, a standard sand:cement screed needs approximately 11kg of cement and 28 litres of sand per square metre, plus a 10% wastage allowance. A 50kg bag of cement covers roughly 4.5 square metres at 25mm before wastage. This calculator scales that figure to your own area and thickness automatically.
It depends on the screed type. Monolithic screed, laid while the base slab is still wet, runs 15 to 40mm. Bonded screed onto a hardened slab needs 25 to 50mm. Unbonded screed over a damp-proof membrane needs at least 50mm, and unbonded screed over a compressible layer such as underfloor-heating insulation needs at least 70mm.
Self-levelling screed is a pre-mixed bagged compound you pour and it settles flat on its own, unlike hand-floated sand:cement screed. Coverage varies by product type: a thin levelling compound typically covers around 4 square metres per 20kg bag at 2.5mm and shouldn't exceed 3 to 4mm per application, while a thicker structural self-levelling screed covers a similar rate per millimetre but can be applied up to 10mm in a single pour. Always check your specific product's datasheet, since brands vary.
Concrete is the structural slab itself, poured thick with coarse aggregate (stone) mixed in to carry load. Screed is a thin, aggregate-free sand:cement layer laid over that structural slab purely to create a smooth, level surface ready for tiling, flooring or carpet. You need a concrete volume calculator for the slab and a screed calculator for the finishing layer on top of it, they are not the same calculation.
Pricing varies widely by region and screed type. DIY materials-only sand:cement screed runs roughly R80 to R120 per square metre. A professionally installed standard screed typically costs R180 to R250 per square metre, while self-levelling or commercial-grade screed installed by a contractor can run R350 to R500 or more per square metre. Get a local quote to confirm, since this is a market rate, not a fixed price.
No. Plaster is applied to walls and ceilings for a smooth vertical finish. Screed is applied to floors for a smooth horizontal finish ready for a floor covering. Both use a similar sand:cement family of mixes, but they are different applications with different mix proportions and thickness rules, and this site has a separate plaster calculator for wall and ceiling work.