Artisan & Labour Costs in South Africa
What bricklaying, plastering, tiling, plumbing and electrical work should actually cost, so you know before you accept a quote, not after.
Quick answer: Labour-only rates vary by city and region. Our October 2026 estimates: bricklaying R120–R380/m² depending on wall type, plastering R42–R130/m², tiling about R90–R320/m² and paving R80–R150/m². Below: 17 calculators covering bricklaying, plastering, tiling, plumbing, electrical and garden work, grouped by trade so you can price a job before a contractor ever quotes it.
On this page
- Bricklaying: What a Bricklayer Should Charge
- Plastering and Painting: Coat by Coat
- Tiling and Paving: Priced by the Square Metre
- Plumbing and Water: Sizing It Right the First Time
- Electrical: Load, Cable and Backup Sizing
- Garden and Landscaping: Water and Soil by the Numbers
- Frequently Asked Questions
A contractor's quote is only useful once you have a number of your own to compare it against. Most homeowners accept the first quote because they have nothing to check it against, not because the quote was actually fair. This page groups every trade calculator on the site by the work itself: brick, plaster, tile, pipe, wire and garden. Each has real 2026 SA labour rates and a calculator sized to your own job, so you walk into a quote knowing roughly what you should be paying before the contractor tells you.
The overview below maps the six trade groups on this page. Bricklaying, plastering, painting, tiling and paving tools estimate labour. Plumbing, water and electrical tools help with sizing; garden tools cover irrigation and soil quantities. Use the matching section below, and keep labour charges separate from material quantities when comparing quotes.
Bricklaying: What a Bricklayer Should Charge
SA bricklaying labour runs roughly R120–R200/m² for a single-skin (half-brick) wall and R220–R380/m² for a double-skin (one-brick) wall in 2026, labour only, materials extra. These are Gauteng-based estimates from published rate guides; rates elsewhere vary by city and region. Face brick costs more than plastered stock brick because the exposed finish demands neater workmanship, and walls built at scaffold height move the estimate up the range. Boundary walls and structural brickwork are among the most commonly quoted jobs on any SA property.
Price your wall by area, skin type, brick finish and province.
Bricklaying Labour Calculator →Plastering and Painting: Coat by Coat
Plastering labour runs R42–R68/m² for a finish coat only and R85–R130/m² for both coats combined, with a scratch coat alone at roughly R50–R78/m² (our own estimate). Sand, cement and bonding agent are charged separately. Painting labour is roughly R40–R100/m² for interior walls, ceilings and exterior walls (labour only), with Cape Town and Johannesburg typically at the higher end in both plastering and painting. Rates vary by city and region, and the other figures are our estimates from published rate guides. The two are covered together in our plastering & painting cost guide, since they're almost always quoted as one job on a new build or renovation.
Estimate plasterer labour cost by coat type and wall area.
Plastering Labour Calculator →For the painting side specifically, use the Paint Labour Estimator. If you need paint material quantities and cost rather than labour, that's a separate Developer-category tool.
Tiling and Paving: Priced by the Square Metre
Tiling labour runs roughly R90–R320/m² in 2026 (our estimate from published rate guides; rates vary by city and region). Tiles, adhesive and grout are extra, and large-format tiles, diagonal layouts and wet-area waterproofing all push rates toward the higher end. Paving labour for interlocking pavers in a running-bond pattern runs R80–R150/m², with full excavation, sub-base preparation and compaction adding a further R40–R180/m² depending on soil conditions. Herringbone and other pattern layouts cost more again. Both are covered in full, including waterproofing membranes and base-prep detail, in our tiling & paving cost guide.
Price your floor or wall tiling job by area and layout.
Tiling Labour Calculator →For a driveway or patio, the Paving Labour Calculator covers laying pattern and base preparation separately.
Plumbing and Water: Sizing It Right the First Time
Geyser sizing follows the common industry rule of thumb of about 50 litres of hot water per person per day, so a family of 4 needs a geyser of about 200 litres (60–70L/person for high-usage households with double showers or a bathtub). Check yours with the Geyser Size Calculator. Water storage follows our planning default of 150 litres per person per day; a 4-person household wanting 3 days of security during supply interruptions needs at least 1,800 litres, which is why a 2,500-litre JoJo tank is the most common household choice. Size yours with the Water Tank Calculator. Pipe sizing itself follows SANS 10252-1's velocity limits: 3.0 m/s at most for buried pipes or where noise is not a concern, and 1.5 to 2.5 m/s where noise matters. For domestic installations the standard's recommended design velocity is 2 m/s or less, which is the default the calculator uses for pipework inside the house. Check yours with the Pipe Flow Calculator. And if you're catching roof runoff rather than buying it in, the Rainwater Harvesting Calculator works from your actual roof area and province rainfall. A 120m² Gauteng roof collects roughly 69,100 litres a year.
Work out the right geyser size for your household.
Geyser Size Calculator →Electrical: Load, Cable and Backup Sizing
Cable size is governed by both current-carrying capacity and voltage drop. A 3kW geyser on 230V draws about 13A, and 2.5mm² is common trade practice for short runs. SANS 10142-1 limits voltage drop to 5% of the nominal voltage (about 11.5V on 230V) and sets no fixed minimum cable size, so a longer run may need a larger cable, such as 4mm², to stay within that limit. Check yours with the Cable Size Calculator or the standalone Voltage Drop Calculator. Total DB board load is the sum of every circuit breaker rating, but a realistic picture applies a 50–70% diversity factor rather than adding nameplate sizes directly. The DB Board Load Calculator does this for you. For load-shedding backup, an inverter is sized from your essential-load wattage ×1.25, while a generator needs the same load divided by a 0.8 power factor plus a 25% margin, and motor loads like fridges and pumps need ×3 for starting surge on either. For daytime solar offset, a typical 20–30 kWh/day home needs 9–13 standard 550W panels. Size yours with the Solar Panel Sizing Calculator.
Check your cable size and voltage drop against SANS 10142.
Cable Size Calculator →Garden and Landscaping: Water and Soil by the Numbers
SA lawns typically need 25–40mm of water a week in summer. Kikuyu, the most drought-tolerant common lawn grass, needs around 25–30mm/week in Gauteng, while LM Berea needs a lower 20–25mm/week baseline. Build a water-wise schedule for your own lawn and province with the Irrigation Calculator. For beds and new lawns, the standard SA topsoil depth is 150mm (0.15m³ per m²): a 20m² bed needs 3m³ net, or 3.45m³ once you add the standard 15% settling buffer, which the Soil Volume Calculator converts straight into bulk-bag quantities.
Work out topsoil, compost or mulch volume for your beds and lawn.
Soil Volume Calculator →Frequently Asked Questions
SA bricklaying labour costs roughly R120–R200/m² for a single-skin (half-brick) wall and R220–R380/m² for a double-skin (one-brick) wall in 2026. These are Gauteng-based estimates from published rate guides; rates elsewhere vary by city and region. Face brick costs more than plastered stock brick because the exposed finish demands neater workmanship. Rates are labour-only; materials are extra.
SA plastering labour rates in 2026 are approximately R42–R68/m² for a finish coat only and R85–R130/m² for both coats combined, with a scratch coat alone at roughly R50–R78/m² (our own estimate). These are labour-only rates: sand, cement and bonding agent are charged separately, with Cape Town and Johannesburg at the higher end.
SA tiling labour runs roughly R90–R320/m² in 2026. Rates vary by city and region, and these are our estimates from published rate guides. These are labour-only rates: tiles, adhesive and grout are extra. Large-format tiles, diagonal layouts and wet-area waterproofing all push rates toward the higher end.
The common industry rule of thumb is about 50 litres of hot water per person per day, so a family of 4 needs a geyser of about 200 litres. For water storage, our planning default for household consumption is 150 litres per person per day. A 4-person household wanting 3 days of security needs at least 1,800 litres, making a 2,500-litre JoJo tank the most common household choice.
A 3kW geyser on a 230V single-phase supply draws approximately 13A, and 2.5mm² copper cable is common trade practice for short runs. SANS 10142-1 limits voltage drop to 5% of the nominal voltage (about 11.5V on a 230V supply) and sets no fixed minimum cable size, so a longer run may need a larger cable, such as 4mm², to stay within that limit.
A typical South African home uses 20–30 kWh per day. With 550W panels averaging 5.5 peak sun hours daily and standard 80% system efficiency, each panel generates roughly 2.4 kWh/day, meaning a typical home needs 9–13 panels for daytime load reduction, or more with a 20–30% buffer for full off-grid battery backup.
The Complete Guide: what to ask a contractor for, how to spot an underpriced quote, and the questions that tell you whether a price is actually fair before you sign.
Artisan Quoting & Pricing Guide →